Skip to content

Commit

Permalink
Browse files Browse the repository at this point in the history
Edits completed: (1) Added in new graph, (2) mentioned use of pairing…
… risk and costs, (3) changing references to 'estimation metric' to either be specific or more generic as situtation needed. Needs: (1) Quick read through to make sure edits did not break flow, (2) define the pairing of the risk and cost as the paper's estimation metric
  • Loading branch information
paw10003 committed Jul 19, 2016
1 parent a9688cc commit e41caba
Show file tree
Hide file tree
Showing 2 changed files with 78 additions and 55 deletions.
Binary file added SecurityRiskPaper.pdf
Binary file not shown.

0 comments on commit e41caba

Please sign in to comment.