master
Commits on Jul 21, 2016
-
Fix to wireless transmitter example size to maintain 16 page limit
Duncan committedJul 21, 2016 -
joc02012 committed
Jul 21, 2016 -
added alpha term to exponential model
replaced SM with SL some other minor edits
joc02012 committedJul 21, 2016 -
Sync of folder from desktop to ensure all git repos are up to date
paw10003 committedJul 21, 2016 -
Final edits to paper. Moved reference for security implementation cos…
…t out from costs equation and moved to SR and costs comparison.
paw10003 committedJul 21, 2016
Commits on Jul 20, 2016
-
Merge branch 'master' of github.uconn.edu:paw10003/AADLPaper_CANS int…
…o HEAD
paw10003 committedJul 20, 2016 -
Addition of new table. Need: Complete rest of edits once home
Duncan committedJul 20, 2016 -
joc02012 committed
Jul 20, 2016
Commits on Jul 19, 2016
-
Duncan committed
Jul 19, 2016 -
Change of file name and push of fixed version. Need to perform last r…
…ead through and mention in paper that development of SR and Costs euqations represent the estimation metric(s)
Duncan committedJul 19, 2016 -
Revert "Edits completed: (1) Added in new graph, (2) mentioned use of…
… pairing risk and costs, (3) changing references to 'estimation metric' to either be specific or more generic as situtation needed. Needs: (1) Quick read through to make sure edits did not break flow, (2) define the pairing of the risk and cost as the paper's estimation metric" This reverts commit e41caba.
paw10003 committedJul 19, 2016 -
Edits completed: (1) Added in new graph, (2) mentioned use of pairing…
… risk and costs, (3) changing references to 'estimation metric' to either be specific or more generic as situtation needed. Needs: (1) Quick read through to make sure edits did not break flow, (2) define the pairing of the risk and cost as the paper's estimation metric
paw10003 committedJul 19, 2016 -
Some edits on the tables and labeling. Fixed the table references iss…
…ue. Need to: (1) add graph of SR(I), (2) mention pairing of risk and cost plus how different examination gives different results, (3) remove PBD image and AADL + listing section.
Duncan committedJul 19, 2016
Commits on Jul 18, 2016
-
Duncan committed
Jul 18, 2016
Commits on Jul 16, 2016
-
Addition of new math and numbers, including new tables. Note Bene: We…
…ird issue where all table references are '5'. Unsure how to fix
Duncan committedJul 16, 2016
Commits on Jul 14, 2016
-
Edits before Chandy meeting tomorrow. New edited/organized version
Duncan committedJul 14, 2016
Commits on Jul 10, 2016
-
Addition of Sources for Business Risk
Duncan committedJul 10, 2016
Commits on Jul 9, 2016
-
Simple larger-picture edits. Sync befopre sausage burns.
Duncan committedJul 9, 2016
Commits on Jul 8, 2016
-
Edits to paper to include math for new security risk, costs, and esti…
…mation metrics calculcaitons. Addition of new table values.
Duncan committedJul 8, 2016
Commits on Jul 6, 2016
-
Addition of image showing risk behavior and starting writing on devel…
…opment of risk equation for assests.
Duncan committedJul 6, 2016
Commits on Jul 5, 2016
-
Major edits and cuts. Addition of images for wireless transmitter des…
…ign examples. Issue: Still have references on page 17
Duncan committedJul 5, 2016 -
Duncan committed
Jul 5, 2016 -
joc02012 committed
Jul 5, 2016
Commits on Jul 2, 2016
-
Small edits: addition of abstract, remove of some writing.
Duncan committedJul 2, 2016
Commits on Jul 1, 2016
-
Done with changes to writing. Now to do heavy editing and cutting dow…
…n of sections.
Duncan committedJul 1, 2016 -
Example of estimation metric calculation added along with table of po…
…tential values. Next steps: finish writing out the extension of consideration sections. Fix writing within the paper to cut down pages, fix topics for framework example, ensure flow is stilll there
Duncan committedJul 1, 2016
Commits on Jun 30, 2016
-
Nearly full edit. Last addition before draft complete: Show example o…
…f the proposed estimation metric equation being used for the wireless transmitter example problem.
Duncan committedJun 30, 2016 -
Edits to Introduction and Motivation sections into actual writing. Cu…
…rrent work: moving the Risk section from an outline into a fully written section.
Duncan committedJun 30, 2016
Commits on Jun 29, 2016
-
Finished fleshing out outline. Next need to combine seciton ramblins …
…into outline to create first draft. Should be able to complete by end of the day tomorrow (Wednesday).
Duncan committedJun 29, 2016
Commits on Jun 28, 2016
-
Additional writing for framework and simple example sections. Additio…
…n on citiations for Ferrante et. al. work on security metrics.
Duncan committedJun 28, 2016 -
Fleshing out of bullet outline for each section. Next step: Complete …
…bullet outline for sections 4 to the end. Next: incorporate all the included images, equations, and writing into a complete draft of the paper by the end of the day Wednesday.
Duncan committedJun 28, 2016 -
Fleshing out of outline for CANs paper. Next step: write out all sect…
…ions to try and have draft for Wednesday.
Duncan committedJun 28, 2016
Commits on Jun 27, 2016
-
Sync work from Desktopolis. Couldn't push from there, pushing from Ar…
…tII.
Duncan committedJun 27, 2016
Commits on Jun 24, 2016
-
Push of first outline. Need addition of equations and images.
Duncan committedJun 24, 2016
Commits on Jun 21, 2016
-
paw10003 committed
Jun 21, 2016