Skip to content
Permalink
master

Commits on Jul 21, 2016

  1. some more final edits

    joc02012 committed Jul 21, 2016
  2. added alpha term to exponential model

    replaced SM with SL
    some other minor edits
    joc02012 committed Jul 21, 2016
  3. Final edits to paper. Moved reference for security implementation cos…

    …t out from costs equation and moved to SR and costs comparison.
    paw10003 committed Jul 21, 2016

Commits on Jul 19, 2016

  1. Final edits for Chandy review

    Duncan
    Duncan committed Jul 19, 2016
  2. Change of file name and push of fixed version. Need to perform last r…

    …ead through and mention in paper that development of SR and Costs euqations represent the estimation metric(s)
    Duncan
    Duncan committed Jul 19, 2016
  3. Revert "Edits completed: (1) Added in new graph, (2) mentioned use of…

    … pairing risk and costs, (3) changing references to 'estimation metric' to either be specific or more generic as situtation needed. Needs: (1) Quick read through to make sure edits did not break flow, (2) define the pairing of the risk and cost as the paper's estimation metric"
    
    This reverts commit e41caba.
    paw10003 committed Jul 19, 2016
  4. Edits completed: (1) Added in new graph, (2) mentioned use of pairing…

    … risk and costs, (3) changing references to 'estimation metric' to either be specific or more generic as situtation needed. Needs: (1) Quick read through to make sure edits did not break flow, (2) define the pairing of the risk and cost as the paper's estimation metric
    paw10003 committed Jul 19, 2016
  5. Some edits on the tables and labeling. Fixed the table references iss…

    …ue. Need to: (1) add graph of SR(I), (2) mention pairing of risk and cost plus how different examination gives different results, (3) remove PBD image and AADL + listing section.
    Duncan
    Duncan committed Jul 19, 2016

Commits on Jul 18, 2016

  1. Edits by Professor Chandy

    Duncan
    Duncan committed Jul 18, 2016

Commits on Jul 16, 2016

  1. Addition of new math and numbers, including new tables. Note Bene: We…

    …ird issue where all table references are '5'. Unsure how to fix
    Duncan
    Duncan committed Jul 16, 2016

Commits on Jul 14, 2016

Commits on Jul 10, 2016

  1. Addition of Sources for Business Risk

    Duncan
    Duncan committed Jul 10, 2016

Commits on Jul 9, 2016

Commits on Jul 8, 2016

  1. Edits to paper to include math for new security risk, costs, and esti…

    …mation metrics calculcaitons. Addition of new table values.
    Duncan
    Duncan committed Jul 8, 2016

Commits on Jul 6, 2016

  1. Addition of image showing risk behavior and starting writing on devel…

    …opment of risk equation for assests.
    Duncan
    Duncan committed Jul 6, 2016

Commits on Jul 5, 2016

  1. Major edits and cuts. Addition of images for wireless transmitter des…

    …ign examples. Issue: Still have references on page 17
    Duncan
    Duncan committed Jul 5, 2016
  2. Spelling and tense fixes.

    Duncan
    Duncan committed Jul 5, 2016
  3. various edits

    joc02012 committed Jul 5, 2016

Commits on Jul 2, 2016

Commits on Jul 1, 2016

  1. Done with changes to writing. Now to do heavy editing and cutting dow…

    …n of sections.
    Duncan
    Duncan committed Jul 1, 2016
  2. Example of estimation metric calculation added along with table of po…

    …tential values. Next steps: finish writing out the extension of consideration sections. Fix writing within the paper to cut down pages, fix topics for framework example, ensure flow is stilll there
    Duncan
    Duncan committed Jul 1, 2016

Commits on Jun 30, 2016

  1. Nearly full edit. Last addition before draft complete: Show example o…

    …f the proposed estimation metric equation being used for the wireless transmitter example problem.
    Duncan
    Duncan committed Jun 30, 2016
  2. Edits to Introduction and Motivation sections into actual writing. Cu…

    …rrent work: moving the Risk section from an outline into a fully written section.
    Duncan
    Duncan committed Jun 30, 2016

Commits on Jun 29, 2016

  1. Finished fleshing out outline. Next need to combine seciton ramblins …

    …into outline to create first draft. Should be able to complete by end of the day tomorrow (Wednesday).
    Duncan
    Duncan committed Jun 29, 2016

Commits on Jun 28, 2016

  1. Additional writing for framework and simple example sections. Additio…

    …n on citiations for Ferrante et. al. work on security metrics.
    Duncan
    Duncan committed Jun 28, 2016
  2. Fleshing out of bullet outline for each section. Next step: Complete …

    …bullet outline for sections 4 to the end. Next: incorporate all the included images, equations, and writing into a complete draft of the paper by the end of the day Wednesday.
    Duncan
    Duncan committed Jun 28, 2016
  3. Fleshing out of outline for CANs paper. Next step: write out all sect…

    …ions to try and have draft for Wednesday.
    Duncan
    Duncan committed Jun 28, 2016

Commits on Jun 27, 2016

Commits on Jun 24, 2016

Commits on Jun 21, 2016

  1. Initial commit

    paw10003 committed Jun 21, 2016
You can’t perform that action at this time.